Groundworks · Practical advice
Footings and concrete bases: questions before work starts
Understand the purpose, design responsibility and handover information.
Define what the concrete supports
A shed base, a wall footing and a structural foundation are not interchangeable. Explain the proposed structure, dimensions and use, and share the manufacturer’s drawings where relevant. A contractor needs this information before agreeing what will be built. Avoid choosing a depth or thickness from an unrelated online example.
Confirm who specifies the work
Ask who is responsible for the design and whether an engineer or building control input is needed. Ground conditions, nearby structures and services can affect the proposal. The quotation should distinguish between work to an existing design and any design or investigation that still needs to be arranged.
Coordinate levels and connections
Discuss the finished level, access, drainage and any service routes before concrete is placed. If the base supports a supplied building, check the supplier’s requirements and tolerances. Agree how inspection requirements will be accommodated and how unexpected ground conditions will be handled before they disrupt the programme.
Keep the construction record
Ask for relevant drawings, photographs and delivery information to be retained. Confirm curing protection and when the next stage can proceed; readiness should follow the specification and conditions rather than a guessed number of days. At handover, check the agreed dimensions and interfaces and record any matters that need resolution.
Before you book
- What will the base or footing support?
- Who provides the specification?
- Are inspections and service routes coordinated?
- When can the next stage begin?
Related guides
Discuss your project
MPH offers 17 years’ experience across driveways, paving, landscaping and groundworks. Tell us about your property, priorities and the work you have in mind.
