MPH · Lower Dicker

Driveways & landscaping in Lower Dicker

Driveways, dropped kerbs, patios, paving and complete garden work in Lower Dicker. One team to discuss the surfaces, access and groundwork your project needs.

17 years’ experience · Resin-bound trained

Give the lawn a practical setting

Plan a lawn alongside the paths and boundaries that frame it. Tell us where the garden is most used and whether mowing access or wet areas cause problems. We can discuss preparation, turf and adjacent paving or fencing, including what care the new lawn will need after installation.

Read: New turf: preparation and aftercare →

Our services in Lower Dicker

Driveways

Block paving, resin bound, tarmac, concrete and imprinted concrete. Discuss surface choice, preparation, edges and drainage together.

Dropped kerbs & vehicle access

Plan the crossover and private parking area together, with the required highway permissions and conditions checked before construction.

Patios, paving & paths

Porcelain, natural stone and block paving for seating areas, paths and steps, with attention to levels and the surrounding garden.

Gardens, fencing & decking

Turfing, planting, fencing and gates, timber or composite decking, sleeper beds and garden features.

Groundworks, concrete & brickwork

Site preparation, drainage, concrete bases and footings, brick walls, retaining work and entrance pillars, with design requirements agreed for the job.

Plan the work around your property

Start with your postcode, a few photographs and a short description of what you want to change. Include approximate dimensions if you have them and tell us about gates, steps or shared access. We will discuss the information needed for a quotation and what should be assessed on site.

Ask for the scope to distinguish preparation, materials, drainage and finishing details. If the job includes structural work, retaining walls or a vehicle crossover, agree the relevant design and approval requirements before construction. A photograph cannot establish everything below ground.

Ready to discuss your Lower Dicker project?

Tell us your priorities, the features you want to retain and whether you would like the work completed in stages.